Prefabricated Substation for EV Charging | Fast Grid Connection

⚡ EV Charging Infrastructure Solutions

Prefabricated Substation for EV Charging
Deploy 70% Faster, Save 30%+ on Cost

GOHO prefabricated substations deliver complete MV/LV power distribution for EV charging stations in a single, factory-assembled enclosure. Get your charging hub grid-connected in weeks, not months — with guaranteed quality and significantly lower civil works costs.

70%
Faster Installation

30-50%
Lower Total Cost

50-2500kVA
Capacity Range

30+
Countries Served

GOHO Prefabricated Substation for EV Charging

Factory-Built & Tested

The Smarter Way to Power EV Charging Stations

Traditional site-built substations slow down your charging network rollout and drive up costs. Prefabricated substations solve both problems — factory-built, tested, and delivered ready for rapid on-site deployment.

70%
Faster Installation
Go from delivery to energization in as little as 2-3 weeks instead of 3-6 months with conventional construction.

💰
30-50%
Lower Total Cost
Reduce civil works, labor, and project management costs. Factory production scales efficiently, driving down per-unit cost.

📐
60%
Smaller Footprint
All MV switchgear, transformer, and LV distribution integrated in one compact enclosure — maximize space for chargers.

100%
Factory-Tested Quality
Every unit undergoes full functional testing in controlled factory conditions before shipment — no surprises on site.

Prefabricated vs. Site-Built: By The Numbers

10 Weeks
Prefab Total Time
30 Weeks
Site-Built

40% Less
Total Cost
100%
Site-Built Baseline

60% Less
Site Footprint
Full Building
Site-Built Required

Factory
Full Testing
On-Site Only
Field Testing

GOHO Prefabricated Substation Series

Choose from two proven prefabricated substation designs, both optimized for EV charging applications. European type for maximum configurability, American type for ultra-compact pad-mounted deployment.

European Type Prefabricated Substation YBW Series

European Type Prefabricated Substation

YBW Series · 50-2500 kVA

  • Capacity Range50 – 2500 kVA
  • MV Voltage6 – 35 kV
  • LV Voltage400V / 480V
  • ConfigurationMV + Transformer + LV in one box
  • EnclosureMetal-clad, IP3X-IP54
  • Best ForHigh-capacity charging hubs & fleets

The YBW series integrates MV switchgear (HXGN15-12 RMU), distribution transformer, and LV distribution (GGD series) in a single compact kiosk. Fully customizable for charging station requirements including PFC and harmonic filtering.

American Type Pad-Mounted Prefabricated Substation ZGS Series

American Type Prefabricated Substation

ZGS Series / Pad-Mounted · 50-1600 kVA

  • Capacity Range50 – 1600 kVA
  • MV Voltage10 – 35 kV
  • LV Voltage400V / 480V
  • ConfigurationPad-mounted, compact design
  • EnclosureSteel tank, IP65 rated
  • Best ForUrban chargers & tight-space sites

Pad-mounted American-style substations combine the MV load break switch, transformer, and LV breaker in a single tamper-proof enclosure. Ideal for public charging stations where aesthetics and safety are paramount.

Substation Sizing by Charging Station Capacity

Use this quick reference to find the right prefabricated substation for your EV charging project. Our engineering team provides custom sizing based on your exact charger mix and site conditions.

Charging CapacityRecommended SubstationMV SwitchgearLV Switchgear
120-240 kW
4-8 x 30kW chargers
315 kVA Prefab SubstationHXGN15-12 RMU (2-way)GGD LV Distribution Panel
360-500 kW
6-10 x 60kW chargers
630 kVA Prefab SubstationHXGN15-12 RMU (2-way + breaker)GGD + PFC + Harmonic Filter
720 kW – 1 MW
8-16 x 60-120kW DCFC
1250 kVA Prefab SubstationHXGN15-12 RMU + VCBGGD + PFC + AHF + Metering
1 – 2 MW
16-32 x 60-120kW DCFC
2000-2500 kVA Prefab SubstationKYN28-12 VCB PanelMNS/GCK + PFC + AHF + SCADA
2 MW+
Multi-megawatt hub / fleet depot
Custom Multi-Unit SolutionCustom MV Switchgear ConfigurationCustom LV + Protection + SCADA

Substation SizeStandard ConfigurationStandard Lead TimeExpedited (Rush)Shipping Time
315 – 630 kVA
Small to medium charging sites
Standard RMU + LV panel4 – 6 weeks2 – 3 weeks2 – 4 weeks (sea)
3 – 5 days (air)
800 – 1250 kVA
Large charging hubs
RMU/VCB + LV + PFC6 – 8 weeks4 – 5 weeks2 – 4 weeks (sea)
3 – 5 days (air)
1600 – 2500 kVA
Multi-megawatt hubs
VCB + LV + PFC + AHF + SCADA8 – 10 weeks5 – 6 weeks3 – 5 weeks (sea)
5 – 7 days (air)
Custom / Multi-Unit
Fleet depots, microgrids
Fully custom configuration10 – 14 weeksContact usProject-specific
Note: Lead times are measured from order confirmation to factory dispatch. Site civil works can run in parallel with manufacturing to minimize total project time. Expedited production may be available for urgent projects — contact our team for availability.

Everything Integrated in One Box

Each GOHO prefabricated substation is a complete power distribution system, fully assembled, wired, and tested in our factory before it reaches your site.

Power Flow: From MV Grid to EV Chargers

MV Switchgear
6-35kV Incoming

🔌
Transformer
MV / LV Step-Down

🔌
LV Distribution
Charger Feeders

🔌
PFC & Filtering
Power Quality

📈
Metering
Energy Monitoring

💻
SCADA
Remote Control

MV Switchgear

Ring Main Unit (RMU) or vacuum circuit breaker (VCB) for medium voltage incoming and protection. 6-35kV options available.

Distribution Transformer

Oil-immersed or dry-type transformer from 50-2500kVA. High efficiency, low loss, and suitable for frequent load cycling.

LV Distribution

Low voltage switchgear with ACB/MCCB for charger feeder circuits. Configurable for 4-32+ charging outlets.

Power Factor Correction

Automatic PFC system with harmonic filter to maintain grid power quality and avoid utility penalty charges.

Harmonic Filter

Active or passive harmonic filtering to mitigate THD from fast DC chargers and comply with IEEE 519 / IEC 61000.

Metering & Protection

Smart energy metering, protection relays, surge arresters, and earth fault protection for comprehensive system safety.

SCADA & Remote Monitoring

Optional SCADA system with remote monitoring, alarm notification, and data logging for operational visibility.

HVAC & Ventilation

Natural or forced air cooling, optional climate control for extreme temperature environments, and IP-rated enclosure.

Fire Safety System

Transformer oil containment, smoke detection, and optional fire suppression system per local safety standards.

Built for Charging Network Operators

Designed from the ground up to address the unique challenges of EV charging infrastructure deployment — speed, cost, scalability, and reliability.

🚀

Fast Grid Connection

Weeks not months. Factory assembly parallel paths with site civil works, dramatically compressing your project timeline and time-to-revenue.

🏗

Lower Civil Works Cost

Minimal foundation and civil works required. A simple concrete pad is all you need — no building construction, no complex electrical room build-out.

📈

Easy Expansion

Modular design makes it simple to add capacity as your charging network grows. Add units or upgrade components without full site rebuild.

🔌

Plug-and-Play Deployment

Arrive on site pre-wired and pre-tested. Connect MV cable, LV feeders, and ground — then energize. Minimal on-site labor and coordination.

📊

Remote Monitoring

Built-in SCADA and IoT connectivity let you monitor power quality, energy consumption, and equipment status from your operations center.

🛡

Proven Reliability

Factory testing under IEC standards ensures every component works together. Reduced site variables mean fewer commissioning issues.

Where Prefab Substations Excel

From highway rest stops to urban charging hubs, GOHO prefabricated substations power every type of EV charging deployment.

🛣

Highway Rest Stops

🏙

Urban Charging Hubs

🚛

Fleet Depots

🎪

Temporary Event Charging

Solar + Storage + Charging Microgrids

Real-World Deployments

See how GOHO prefabricated substations are powering EV charging infrastructure across diverse applications and environments.

1 MW Highway Charging Hub Deployment

See how a major European charging operator cut deployment time by 65% and reduced total cost by 38% using GOHO prefabricated substations.

Highway Rest Area Charging Hub — 1250kVA European Type

10 x 120kW DC Fast Chargers | 1 MW Total Capacity | Deployed in 2025

1250 kVA
Substation Capacity

10
DC Fast Chargers

3 Weeks
On-Site Installation

-38%
Total Cost Reduction

Installation Timeline Comparison: Prefabricated vs. Site-Built

Prefabricated
Site Prep
Delivery
MV/LV Connection
Commissioning
Go-Live

~10 Weeks

Site-Built
Design & Permit
Building Construction
Equipment Install
Wiring & Testing
Commissioning

~30 Weeks


Site Preparation

Equipment Delivery

Installation

Testing / Commissioning

Go-Live

Civil Works Cost Breakdown: Prefabricated vs. Site-Built

Civil Works ItemSite-Built SubstationGOHO PrefabricatedSavings
Building / Enclosure Construction$65,000 – $90,000$0 (integrated)100%
Concrete Foundation / Pad$25,000 – $35,000$8,000 – $12,000~65%
Cable Trench & Ducting$15,000 – $22,000$6,000 – $9,000~60%
HVAC & Ventilation System$12,000 – $18,000$0 (integrated)100%
Lighting & Fire Safety$8,000 – $12,000$2,000 – $3,000~75%
Site Grading & Drainage$10,000 – $15,000$5,000 – $8,000~50%
TOTAL CIVIL WORKS$135,000 – $192,000$21,000 – $32,00075-85% Less

Total Cost Comparison: Prefabricated vs. Site-Built

Cost CategorySite-Built SubstationGOHO PrefabricatedSavings
Equipment Cost$185,000$160,00013.5%
Civil Works & Building$120,000$35,00070.8%
Installation Labor$85,000$28,00067.1%
Project Management$45,000$18,00060.0%
Commissioning & Testing$35,000$15,00057.1%
TOTAL$470,000$256,00045.5%

Quick Specification Comparison

Compare key technical parameters between our European and American type prefabricated substations for EV charging applications.

ParameterEuropean Type (YBW Series)American Type (ZGS Series)
Rated Capacity50 – 2500 kVA50 – 1600 kVA
MV Voltage Level6 kV, 10 kV, 20 kV, 35 kV10 kV, 15 kV, 25 kV, 35 kV
LV Voltage Level400V / 480V, 3-phase400V / 480V, 3-phase
MV Switchgear TypeHXGN15-12 RMU / KYN28 VCBPad-mounted load break switch
LV Switchgear TypeGGD / GCK / MNS seriesLV breaker compartment
Transformer TypeOil-immersed or dry-typeOil-immersed (pad-mounted)
Enclosure RatingIP3X – IP54IP65 / NEMA 3R
Cooling MethodNatural / forced air ventilationOil natural / air natural (ONAN)
Protection ClassIEC 60076, IEC 62271ANSI C57.12.28, IEC 60076
Dimensions (L×W×H) — 1250kVA~5.5 × 2.2 × 2.8 m~3.0 × 2.0 × 2.4 m
Approx. Weight — 1250kVA~8,500 kg~6,000 kg
Optional SCADA / Remote MonitoringYesYes (compact version)

Your Trusted Partner in Power Distribution

With over 15 years of experience designing and manufacturing prefabricated substations, GOHO is the partner charging operators trust for reliable, cost-effective power infrastructure.

🏭

15+ Years Experience

Decades of expertise in prefabricated substation design and manufacturing, with thousands of units deployed globally.

🏆

IEC Certified

Full compliance with IEC 62271, IEC 60076, and other international standards. Type-tested and third-party verified.

🌍

30+ Countries Served

Global footprint across Asia, Middle East, Africa, Europe, and Americas. Proven in diverse climates and grid conditions.

🔧

Custom Design Capability

Full in-house engineering team to customize every aspect — from capacity to smart grid integration and aesthetics.

Frequently Asked Questions

Answers to common questions about prefabricated substations for EV charging applications.

How long does it take to install a prefabricated substation for an EV charging station?
+

Typical on-site installation takes 2-4 weeks from delivery to energization, depending on site complexity and utility connection requirements. The total project timeline from order to go-live is typically 8-14 weeks, including factory production (4-8 weeks) and site preparation (which can run in parallel with manufacturing). This is significantly faster than conventional site-built substations, which typically take 16-24 weeks for the same scope.

What size prefabricated substation do I need for my EV charging station?
+

The required size depends on the number and type of chargers, their power rating, and the expected simultaneous utilization (diversity factor). As a rough guide: 4-8 chargers (30-60kW) need ~315-630kVA; 8-16 DC fast chargers (60-120kW) need ~1000-1250kVA; and large hubs with 16+ chargers may need 2000-2500kVA or multiple units. Our engineering team provides free custom sizing based on your specific charger mix and site conditions.

Can prefabricated substations handle the harmonic distortion from fast DC chargers?
+

Yes. Our EV charging-optimized prefabricated substations include integrated active or passive harmonic filtering to manage total harmonic distortion (THD) from fast DC chargers. We design systems to meet IEEE 519 and IEC 61000-3 standards, ensuring no adverse impact on the utility grid or nearby equipment. Each solution includes power factor correction and harmonic analysis as part of the design process.

What is the lifespan of a prefabricated substation?
+

GOHO prefabricated substations are designed for a minimum service life of 25-30 years with proper maintenance. The enclosure is constructed from corrosion-resistant materials with protective coatings suitable for outdoor installation. Major components like transformers typically have 25-30 year lifespans, while switchgear and protective relays have 15-20 year service intervals. We offer comprehensive maintenance and upgrade packages to extend service life and adapt to evolving charging technology.

Can the prefabricated substation be expanded later if I add more chargers?
+

Yes. Modularity is one of the key advantages of prefabricated substations. Our designs support future expansion in several ways: you can upsize the transformer within the same enclosure (if initially undersized), add additional LV feeder circuits for new chargers, or parallel a second prefabricated unit for larger capacity increases. We recommend initially oversizing by 20-30% if you plan to expand within 3-5 years, to minimize future upgrade costs.

Get Your Free Prefab Substation Design & Quote

Tell us about your EV charging project and our engineering team will deliver a customized prefabricated substation design with a detailed cost estimate — free and no obligation.


Free custom sizing & design

Detailed cost breakdown

Delivery timeline estimate

Response within 48 hours

Request a Project Quote

Learn More About EV Charging Infrastructure

Explore our technical guides and articles to make informed decisions about your charging station power infrastructure.

🔌
Guide

EV Charging Station Electrical Infrastructure: A Complete Guide

Everything you need to know about powering EV charging stations — from grid connection to LV distribution design.

Read Article →

Technical

How to Size a Transformer for EV Charging Stations

Learn the methodology behind transformer sizing for DC fast charging, including diversity factors and harmonic considerations.

Read Article →

💰
Cost Analysis

Prefabricated vs. Site-Built Substations: EV Charging Cost Comparison

Detailed cost breakdown comparing prefabricated and conventional substation approaches for EV charging deployments.

Read Article →

Ready to power up your charging network?

Get a free project design and quote from GOHO’s EV charging experts.

Request a Quote

Scroll to Top